South-east elevation of Placeholder HotelA 37 metre long, six-storey building: a dark-panelled ground floor with slim slats in front of the parking level, and five floors of factory-built modules clad in large façade panels, mid-grey on the west block and light grey on the east wing, with one window per room in a slim anthracite frame and a flashing at every module joint, beneath a green roof with a parapet, the DG.11 sign on the parapet and rooftop volumes clad in rhombus shingles.
South-east elevation, drawn from the sketch plans. The interactive 3D story needs WebGL; the construction phases are described below.

Boden, Sweden · New hotel

Placeholder Hotel takes shape in Boden.

Sixty-six rooms over six storeys in central Boden, just off Drottninggatan, built from modules made in our factory. Scroll to watch the hotel rise, phase by phase, from an empty site to opening night.

  • 6Storeys
  • 66Rooms
  • ≈ 110Modules
Scroll
Skip the construction story

01 / 07The site

0%complete

The construction story, in seven phases

01 / 07 · The site

An empty site, set out from the drawings

The gravel lot behind the old hotel on Drottninggatan is cleared and graded, with Färgaregatan along one end. Surveyors stake out the structural grid exactly as drawn: axes A to L along the length and 1 to 3 across. The outline shows every module of the hotel.

From the drawingsGrid A–L × 1–3 · 37.0 × 17.6 m

02 / 07 · Foundation

Groundworks, while the factory starts

The pit is dug, pad footings go in under every column and the ground slab is poured. At the same time, indoors in our factory, the hotel's modules are already being built.

Built modularSite work and module production run in parallel

03 / 07 · The podium

A concrete podium for the parking

The ground floor is cast on site. Columns, the stair and lift bases and a transfer deck form a podium, and the modules will stand on it.

From the drawings4.0 m ground storey · level 2 at +22.11

04 / 07 · The first module

The first module arrives

Each room leaves the factory as a finished volume, with its walls, floor, ceiling, bathroom, windows and façade panels in place. The truck comes down Färgaregatan, and a mobile crane in the courtyard lifts the module off and sets it down on the podium.

From the drawingsOne module per room bay · 3.12 m wide

05 / 07 · Stacking the modules

Five floors, module by module

The modules are set floor by floor, from level 2 up to level 6. The double walls on the drawings mark the module joints. Room modules sit on each side, corridor modules run between them, and the stairs and lift shafts arrive as modules too.

Our reading of the plans≈ 110 modules · 22 per floor

06 / 07 · Roof & finishes

Roof on, crane off

Roof elements close the top floor and the green roof is laid. The crane lifts three shingle-clad roof modules for the plant room straight off the truck. The podium gets its dark panels, slatted screen and glazed lobby, the sign goes up and the crane drives away.

From the drawingsLevel 6 at +34.11 · roof ≈ +37.11

07 / 07 · Completion

Opening night

Landscaping, parking and lighting finish the site. As dusk falls over Drottninggatan, the café terrace fills up, the rooms light up one floor at a time, and on a clear night the northern lights come out.

Placeholder Hotel66 rooms · gym, sauna & relax on level 2

Project facts

A modular hotel with a clear structure.

An L-shaped block on a regular 3.12 m grid. Every bay is one room and one module, so the plan, the modules and the façade all share one rhythm.

Storeys
6

Concrete podium and five module floors

Hotel rooms
66

10 on level 2 · 14 on each of levels 3–6

Modules
110

Estimate: 22 per floor, rooms, corridors and cores

Gross floor area
3 040m²

Estimate from the sketch plans

Height
19.7m

To parapet, estimated

Planned opening
2028

Preliminary, to be confirmed

Typical hotel floor plan, levels 3 to 6L-shaped floor on structural grid A to L and 1 to 3, assembled from 22 volumetric modules whose outlines are drawn inside the walls. Fourteen hotel rooms per floor: ten facing south-east along a corridor, four facing north-west in the west wing, with two lifts and a stair at each end.ABCDEFGHIJKL123HOTEL ROOMSHOTEL ROOMSHOTEL ROOMSCORRIDORGALLERYLIFTS37 020
Typical floor · levels 3–6 · dashed: module outlinesRedrawn from SKISS 1:100

Sustainability and amenities

  • Built in modules. Rooms are made indoors and in the dry, then assembled on site, which means less time on site and less disruption for the neighbours.
  • District heating. The substation sits next to the existing service connection, which keeps the connection short.
  • Miljöbyggnad SilverTarget Certification target for the building, to be confirmed.
  • Green roofProposal Sedum and perennials across the whole roof, around a plant room clad in dark rhombus shingles.
  • Panel façadeProposal Large-format panels, mid-grey on the west block and light grey on the east wing, with slim anthracite window frames, fitted in the factory.
  • Gym, sauna and relax on level 2, with a link to the existing building at the lift lobby.
Request the project brief

Timeline

From sketch to opening.

Preliminary schedule, shown for illustration. All dates are to be confirmed.

  1. Sketch design

    Layouts, grid and technical spaces are coordinated with the consultants.

    Current stage
  2. Building permit

    Detailed design and building permit (bygglov).

  3. Groundworks & podium

    Site set-up, foundations and the concrete podium.

  4. Module production

    The modules are built in our factory while the podium is cast.

  5. Module installation

    The modules are set floor by floor, then the roof goes on.

  6. Opening

    Finishes, landscaping and handover to the operator.

About the company

We build in modules.

Placeholder Company develops and builds hotels, homes and public buildings in northern Sweden, and every one of them is modular. Rooms are built as complete volumes in our factory, protected from the weather, and then assembled on site in a matter of weeks.

From the first sketch to the handover, one team takes responsibility for design, production, cost, programme and quality.

Years in the region
25+
Completed projects
60+
Employees
120

Selected projects

Placeholder grid: add images and details of completed projects.

  • Project title

    Category · Location · Year

  • Project title

    Category · Location · Year

  • Project title

    Category · Location · Year

  • Project title

    Category · Location · Year

  • Project title

    Category · Location · Year

  • Project title

    Category · Location · Year

Team & partners

The people behind the project.

One project team, from design through to operation. Partner names and logos will be added as the procurement is completed.

  • Architect

    Partner name placeholder

  • Structural engineer

    Partner name placeholder

  • MEP engineer

    Partner name placeholder

  • Developer

    Partner name placeholder

  • Modules & main contractor

    Placeholder Company

  • Landscape architect

    Partner name placeholder

Contact

Let's talk about the project.

Investors, partners, future guests and the city: send us a message and the right person on the project team will get back to you.

Office
Placeholder Company AB
Street address placeholder
961 XX Boden, Sweden

We only use your details to answer your message.